Sample documents

See the paperwork before you commit.

The three documents that decide how your build goes: the tender every contractor prices, the inspection report that checks the work, and the milestone schedule that releases your money.

Sample contractor tender

Every contractor prices the same itemised schedule of work, so bids can be compared line by line.

Sample

Schedule of work: grey structure

ItemUnitQuantityRateAmount
Excavation and backfillingcu ft4,2001875,600
Plain cement concrete under footingscu ft520480249,600
Reinforced concrete: footings, columns and slabscu ft1,9006401,216,000
Steel reinforcement, supplied and fixedkg9,8002852,793,000
Brick masonry in cement mortarcu ft3,400210714,000
Damp-proof course and waterproofingsq ft2,25095213,750
Tender total (PKR)5,261,950

Illustrative sample with made-up figures. It shows the layout and level of detail, not Banao prices.

Sample inspection report

After every site visit, a Banao inspector writes up what was checked, what passed and what must be fixed, with photos.

Sample

Site visit: structure stage

  • Pass

    Column reinforcement

    Bar sizes and spacing match the structural drawing.

  • Fix

    Concrete cover

    Cover is short on two column faces. Rectify before the next pour.

  • Pass

    Brick bond and joints

    Uniform joints, plumb within tolerance.

  • Watch

    Curing

    Slab curing started late on day one. Re-check strength at the next visit.

Result: the milestone cannot be approved until the concrete cover is corrected and re-inspected.

Illustrative sample with made-up figures. It shows the layout and level of detail, not Banao prices.

Sample milestone payment schedule

Your money is released stage by stage, and only when the condition for that stage is met and you approve it.

Sample

Payment schedule

StageShare of the tenderReleased when
Mobilisation and excavation10%Site set out, excavation to the drawn depth, photos with a measuring tape in view.
Foundation20%Reinforcement checked by the inspector before concrete, then concrete cured and photographed.
Grey structure35%Columns, slabs and masonry to the approved drawings, with the inspection report signed.
Finishing25%Plaster, flooring, joinery and services complete, with a room-by-room snag list cleared.
Handover10%Final inspection passed, defects list closed and keys handed over.

Illustrative sample with made-up figures. It shows the layout and level of detail, not Banao prices.